PHOTO GALLERY

Upstream end of SGU, with magnets installed and adjusted shown with 5mm gap. July 2005. Downstream end of SGU with magnets installed and adjusted, shown with 5mm gap. July 2005.
Endstation components installed by ACCEL during June 2005. Top view of endstation components.
View of endstation from point of view of CCD. View of beamline with liquid nitrogen line installation complete. November 2004.
Mechanism to position CCD camera. Vertically Focusing Mirror, Bremsstrahlung stop, and photon shutter.
Double Crystal Monochromator Installed White Beam Slits Installed
White Beam Transport

July 2004

 

Front End
Overhead view of 08ID-1 beamline on July 5, 2004. First optical components installed, except for lead for collimator.
White beam transport stands installed. Inside the DCM
SGU with instrumentation wiring

June 2004

 

SGU at CLS Site

April 2004